Case Study

Enhancing offshore safety in Malaysia by eliminating confined space risks in vessel cleaning - Jadestone Energy

Contact us

Get in touch with Jadestone Energy

Jadestone Energy (Australia) Pty Ltd
The Atrium Building
Level 2, 168 St Georges Terrace
Perth, Western Australia, 6000

+61 8 9486 6600

Jadestone Energy (S) Pte Ltd
Talavera Suite 10th Floor, Unit 05-06
Talavera Office Park, Jl. TB Simatupang
Kav.22-26, Jakarta 12430 Indonesia

+62 21 8066 9020

Jadestone Energy (Singapore) Pte Ltd
3 Anson Road
#13-01 Springleaf Tower
Singapore 079909

+65 6324 0359

Mitra Energy (Vietnam Phu Khanh) Pte Ltd
Unit 07-22 The Executive Centre, Level 7
Friendship Tower, 31 Le Duan Boulevard
Ben Nghe Ward, District 1
Ho Chi Minh City, Vietnam

+84 28 38 237 111

Jadestone Energy plc
Human Resources team

careers@jadestone-energy.com

Phil Corbett
Investor Relations Manager

+44 7713 687467
ir@jadestone-energy.com

James Crothers, Billy Clegg
CAMARCO (Financial PR)

+44 (0)203 7574980
jse@camarco.co.uk

Online enquiry

Leave us your details and enquiry below and we will get back to you as soon as possible.

Enquiries

Subscribe to our mailing list

Subscribe to our mailing list

nl subscription

"*" indicates required fields

Enhancing offshore safety in Malaysia by eliminating confined space risks in vessel cleaning

Traditional vessel cleaning in offshore operations often involves manual sludge removal, high water usage, and confined space entry. These conventional methods typically lead to extended downtime, increased operational costs, and reduced production efficiency. Additionally, workers are exposed to hazardous conditions, including toxic gases, chemical residues, and physical strain. Confined space entry is recognised as a high-risk activity and is included in the IOGP’s 9 Life-Saving Rules due to its potential for fatality.

To address these challenges, Jadestone’s Construction Team in Malaysia introduced an innovative vessel cleaning
approach using a Vacuum Pumping System. The cleaning duration was cut from two days to one shift per platform, minimizing production downtime while maintaining the same highquality cleaning results as conventional methods. The process also optimized waste removal, successfully extracting 6.26 m³ of sludge which is equivalent to 43 drums waste, while reducing the freshwater consumption by implementing a vacuum pump cleaning method.

By implementing this safer and more efficient approach, Jadestone is improving worker safety and operational efficiency, setting a new benchmark for offshore maintenance best practices.

Traditional vessel cleaning in offshore operations often involves manual sludge removal, high water usage, and confined space entry. These conventional methods typically lead to extended downtime, increased operational costs, and reduced production efficiency. Additionally, workers are exposed to hazardous conditions, including toxic gases, chemical residues, and physical strain. Confined space entry is recognised as a high-risk activity and is included in the IOGP’s 9 Life-Saving Rules due to its potential for fatality.

To address these challenges, Jadestone’s Construction Team in Malaysia introduced an innovative vessel cleaning approach using a Vacuum Pumping System. The cleaning duration was cut from two days to one shift per platform, minimizing production downtime while maintaining the same highquality cleaning results as conventional methods. The process also optimized waste removal, successfully extracting 6.26 m³ of sludge which is equivalent to 43 drums waste, while reducing the freshwater consumption by implementing a vacuum pump cleaning method.

By implementing this safer and more efficient approach, Jadestone is improving worker safety and operational efficiency, setting a new benchmark for offshore maintenance best practices.